Kellogg’s · General Mills · Nestlé · Tyson · Cargill · Hershey

Food & Beverage

Bulk flow, changeovers, sanitation windows, shelf life and seasonal supply.

Read more →
Unilever · Estée Lauder · Rich Products · Hewlett-Packard

Packaging & CPG

Five machines at 85% OEE in series give a line near 44%. Surge sizing, SKU changeovers, micro-stops and reblend.

Read more →
Rohm & Haas · ICI Paints · Glidden · Elf AtoChem

Chemicals, Oil & Gas

There are no parts, only material moving at a rate. Intermediate storage, campaign scheduling and shared vessels.

Read more →
Eli Lilly · Genentech · Glaxo Wellcome · Pfizer

Pharma & Life Sciences

The constraint is usually a wait, not a machine, such as quality release, validated cleaning or batch integrity.

Read more →
Delphi · Ericsson · Lucent · Bosch · JTEKT

Electronics & Automotive

Takted lines with minimal inventory, where every stoppage propagates immediately in both directions.

Read more →
Boeing · Lockheed Martin · Raytheon · NASA · Sandia

Aerospace & Defense

Low volume over a long horizon, limited by fixtures, bays and qualified people rather than machine rates.

Read more →

Not on this list?

The method cares about structure rather than product. If your operation has stages that must run in step, storage between them, changeovers, and failures that arrive unpredictably, it's the same problem. The same buffer arithmetic sizes a surge tank in a chemical plant and an assembly fixture at a launch site.

The browser Sandbox shows a bottling line and its engine results with no download and no sign-up, and the guides cover the arguments without reference to any particular industry.

Related: All case studies · Supply chain simulation · Guides · Methodology